Status

Accepted (2026-08-23).

Context

Rubric section 23 asks for client-side performance that is measured rather than assumed, naming Core Web Vitals (LCP, INP, CLS) or an equivalent as the evidence (Website/docs-src/governance/ArchitectureEvaluationCriteria.md:606, category at :596). It is the client-side complement of section 12 (:349), which the backend already answers two ways: ADR-060 gates MMCA.Common's hot paths on a committed BenchmarkDotNet baseline, and the deployed apps run a k6 load test against read endpoints on a schedule.

Neither reaches the browser. A benchmark measures managed allocations and a ratio between two methods in one process; k6 measures what the server returns, not when a page paints, whether it shifts under the reader, or how long the first interaction takes to be handled. A Blazor render-mode change, a heavier prerender payload, an unsized image, or a chrome change that reflows after hydration are all invisible to both, and all of them are what the reader experiences as "slow".

The measurement problem is the mirror image of ADR-060's. There, absolute wall-clock latency on a shared runner was too noisy to assert. Here the numbers are noisy too (a two-core hosted runner carrying SQL Server, Redis, RabbitMQ, every service, the UI and Playwright at once), but the metric has something a microbenchmark does not: an externally defined "good" band that is orders of magnitude above the measured values on this hardware. That gap is what makes an absolute client-side ceiling assertable where an absolute nanosecond count is not.

The third problem is placement. A number captured in a report nobody reads is not a budget. To be one it has to fail something, and the only place a real engine already runs against a real stack is the Playwright suite that ADR-063 made a deploy gate for accessibility.

Decision

Ship the measurement infrastructure and the assert mechanics in MMCA.Common.Testing.E2E, default the budget to the Core Web Vitals good band, and let the assertions ride the existing deploy-gating E2E suite.

  • The collector is a shipped, dependency-free measurement type. WebVitalsCollector (MMCA.Common/Source/Hosting/MMCA.Common.Testing.E2E/Infrastructure/WebVitalsCollector.cs:20, in the published package MMCA.Common.Testing.E2E, MMCA.Common/FACTS.md:35) installs PerformanceObserver hooks as a Playwright init script so they exist before first paint (InstallAsync, :40, script at :26-35), accumulating LCP, CLS, FCP and an event-timing INP sample into window.__vitals. CollectAsync (:47) reads them back and stamps TTFB from Navigation Timing (:52-54). No third-party JS and no network egress: every observer is wrapped in try/catch so an engine lacking the entry type leaves that metric at 0 rather than throwing (:22-25).
  • The budget is a record whose defaults are the good band. WebVitalsBudget (:103) defaults to Lcp = 2500, Fcp = 1800, Ttfb = 800, Cls = 0.1 and Inp = 500 (:104-108): the Core Web Vitals good thresholds for LCP, FCP and CLS, plus a TTFB ceiling and a single-interaction INP sample ceiling. The parameters are defaulted, not constants, so a consumer whose measured maxima justify tighter numbers passes its own (:92-96).
  • A breach is a thrown test failure naming the page. AssertWithinBudget (:137) asserts each metric with Should().BeLessThanOrEqualTo (:143-146) and formats every failure as {metric} {measured} exceeded budget {budget} on {path} (:154-157), so a red gate points at the page rather than at a dashboard.
  • A zero INP is skipped, not read as a pass. The INP assertion runs only when a sample was actually recorded (:148-151): no interaction clearing the observer's 16 ms durationThreshold (:35) leaves the field at 0, which must mean neither pass-by-absence nor failure.
  • Every run leaves a citable artifact and a citable line. WriteArtifactAsync (:63) writes web-vitals-{label}.json (:70) as a WebVitalsArtifact envelope (:90) wrapping the measured WebVitalsSample (:76), under WEB_VITALS_OUTPUT_DIR or artifacts/ beneath the working directory (:65-66); Describe (:118) renders the same sample as one invariant-culture line (:122-124) that AssertWithinBudget writes to test output.
  • Both deployed apps assert the shipped defaults. ADC's WebVitalsTests (MMCA.ADC/Tests/E2E/MMCA.ADC.E2E.Tests/Workflows/WebVitalsTests.cs:23) holds one shared WebVitalsBudget constructed with no arguments (:27, stated at :25-26) and measures four surfaces: home (:36), the public events entry point including its redirect (:47), the session list (:56) and login (:60). Store's (MMCA.Store/Tests/E2E/MMCA.Store.E2E.Tests/Workflows/WebVitalsTests.cs:25) constructs the same defaults inline (:68, :94) over home (:34), the catalog browse page (:38), login (:42) and product detail reached by navigation rather than a hard-coded id (:53). Both drive one scripted search interaction on the grid page so the event-timing observer records an INP sample (ADC :70-81, Store :78-89).
  • The numbers are calibrated against measured maxima, not picked to be safe. ADC's remarks record LCP 624 / FCP 444 / TTFB 27 ms / CLS 0.005 / INP 32 on run 29146540154, roughly 4x to 30x headroom (MMCA.ADC/.../WebVitalsTests.cs:14-17); Store's record LCP 172 / FCP 172 / TTFB 26 ms / CLS 0 / INP 24 on run 29146556386, roughly 10x to 30x (MMCA.Store/.../WebVitalsTests.cs:14-19). Both were calibrated 2026-07-11.
  • The assertions ride the deploy gate because the workflow runs the whole project. e2e.yml runs dotnet test --project ...E2E.Tests.csproj with no filter (ADC .github/workflows/e2e.yml:326-329, Store :369-372) and points WEB_VITALS_OUTPUT_DIR at the uploaded diagnostics directory (ADC :304, Store :364). deploy.yml calls that workflow chromium-only as e2e-gate (ADC deploy.yml:531-542, Store :537-548), and the deploy job both lists it in needs (ADC :866, Store :862) and requires it to be success or skipped (ADC :896, Store :893). A front-end performance budget is therefore a production precondition on the same footing as the SBOM, the cost guard and the freshness gates, and deploy.yml says so where the k6 gate is defined (ADC :604-605, Store :611-612).
  • The framework measures its own UI, under its own looser numbers. WebVitalsE2ETests (MMCA.Common/Tests/Presentation/MMCA.Common.UI.E2E.Tests/WebVitalsE2ETests.cs:16) uses the same collector against the backend-less in-process gallery for the login and components pages (:28, :32) but asserts three local constants, LCP 8000 ms, TTFB 4000 ms and CLS 0.25 (:18-20, asserted at :43-45), rather than WebVitalsBudget: the gallery is a backstop against catastrophic regression in the shared chrome (a render loop, a giant synchronous asset, a layout-shifting theme change), not a calibrated app budget (:8-14).
  • The regression behaviour is pinned by unit tests, not by the browser runs. WebVitalsBudgetTests (.../MMCA.Common.UI.E2E.Tests/WebVitalsBudgetTests.cs:12) starts no browser and covers exactly what only ever fires on a regression: that the defaults are the good band (:17-26), that each of the five metrics fails when it exceeds its ceiling (:45-56), that a 0 INP is skipped (:58-64), that a caller-supplied budget is honoured in both directions (:66-73), and the exact text of the sample line (:32-43).

Adoption is the two deployed apps plus the framework gallery. MMCA.Helpdesk has neither: it pins the package (MMCA.Helpdesk/Directory.Packages.props:66) but has no E2E test project at all, so the seed carries no worked example of a client-side budget, the same gap ADR-063 records for accessibility.

Rationale

  • The good band is an external contract, which is what makes an absolute ceiling defensible here. ADR-060 refused absolute latency because a nanosecond count is a property of the runner. LCP 2500 ms is not a claim about this runner: it is the published threshold the metric is defined against, and the measured values sit 4x to 30x below it. The noise floor of a two-core hosted runner fits inside that gap with room to spare, so the assertion survives a noisy neighbour and still fires on a real regression.
  • Calibrating against observed maxima is what separates a budget from a backstop. Numbers chosen by feel end up either flaky or vacuous. Recording the run id and the measured maximum next to the ceiling (ADC WebVitalsTests.cs:14-17) makes the headroom a reviewable fact and makes a future tightening an evidence-based edit rather than a guess.
  • Ship the mechanics, keep the numbers with the consumer. The assert body, the message format, the artifact shape and the INP-zero carve-out are subtle and identical everywhere, so they belong in the package (WebVitalsCollector.cs:16-18). The ceilings depend on hosting and runner, so they belong to the app. Defaulted record parameters express exactly that split: both apps happen to take the defaults today, and either can tighten without a framework change.
  • Reuse the gate that already exists. A separate performance workflow would be another twenty-minute Aspire boot and another thing to keep green. Because the suite runs the whole project, adding a test class added a deploy-gating budget at zero marginal CI cost, the same lever ADR-063 used for accessibility.
  • A single-interaction sample is honest about what it is. Field INP is a p75 over real sessions and cannot be produced by one scripted click. Naming the metric INP-sample in the output line (WebVitalsCollector.cs:124) and in the parameter documentation (:102) keeps the assertion from claiming more than it measured.
  • Artifacts make a red gate diagnosable and a green one auditable. The JSON envelope plus the one-line record mean a reviewer can compare today's numbers against the calibration run instead of re-running the suite to find out what happened.

Trade-offs

  • The gate is ui-scoped and may legitimately skip. Both apps gate e2e-gate on a ui change filter (ADC deploy.yml:538, Store :544) and deploy accepts skipped for it (ADC :896, Store :893), so a backend-only or infra-only deploy ships with no Web Vitals measurement of that commit. Same intended cost trade as the accessibility gate, and the same caveat: "deployed" does not always mean "the budget ran on this commit".
  • It never runs on a pull request. The E2E project is in neither solution filter and the gate is push/dispatch only (ADC deploy.yml:538, Store :544), so a regression is caught between merge and rollout, not before merge.
  • The measured configuration is not the production one. CI pins the UI to InteractiveServer (ADC e2e.yml:218, Store :210), so the numbers describe Server-mode prerender-then-hydrate under runner contention, not production's InteractiveAuto on real hardware (ADC WebVitalsTests.cs:10-13, the caveat ADR-056 also records).
  • A marginal breach can be retried away. The suite runs with --retry-failed-tests 2 (ADC e2e.yml:329, Store :372), which is what absorbs a contention spike but also means a budget that fails once and passes twice reports green.
  • LCP and CLS are Chromium-only. On Firefox and WebKit those observers fail silently and the fields stay 0, so the assertions pass vacuously (WebVitalsCollector.cs:14-16). The deploy gate is chromium-only, so this is real only for MMCA.Common's three-engine ui-e2e matrix (MMCA.Common/.github/workflows/ci.yml:237), where two of the three legs assert LCP and CLS against nothing.
  • Coverage is a hand-picked page list. Four pages in ADC and four in Store, against far larger inventories. Nothing forces a new page to acquire a budget, so breadth grows by discipline, the same caveat as the accessibility suites.
  • Only pages with a search box get an INP sample. The interaction is best-effort and page-specific (ADC WebVitalsTests.cs:73-78, Store :81-86); on every other measured page INP stays 0 and its assertion is skipped, so interaction latency is asserted on one page per app.
  • The green-run artifact is written but not kept. Both workflows upload the diagnostics bundle only on failure (ADC e2e.yml:355-359, Store :398-404), and MMCA.Common's ui-e2e job sets no WEB_VITALS_OUTPUT_DIR at all and uploads only Playwright traces (ci.yml:316-322), so the JSON lands beside the test binaries and is discarded with the runner. There is no time series: the sample line in the run log is the only surviving record of a green run.
  • Nothing stops a ceiling being raised to silence a red gate. As with ADR-060's baseline, the defaults are a value in source and widening them is a reviewable diff, not a tool-enforced one.

ADR-063 (the structural sibling: the same package, the same Playwright suite and the same deploy gate, applied to WCAG 2.1 AA instead of load performance), ADR-060 (the backend half of rubric section 12: a committed BenchmarkDotNet baseline gating MMCA.Common pull requests, where this gates the two consumer apps' deploys at the browser), ADR-056 (the render-mode decision these numbers measure, and which already cites this suite for the Server-mode-in-CI caveat), ADR-015 (the invariant-over-discipline posture applied to structure, of which this is the client-side runtime-cost instance), ADR-041 (production telemetry, which observes server-side cost after deploy where this fails a client-side budget before rollout).